
Open Hours: Mon - Fri 8.00 am - 6.00 pm
Product Description
The BYD Yuan Up is based on the e-Platform 3.0 shared with the standard Yuan model and is powered by BYD's Blade lithium-ion LFP Battery. The entry-level Yuan Up is equipped with a 32 kWh battery supporting 187 miles (301 km) of CLTC range. The maximum power output is 70 kW and 180 Nm. Acceleration time from 0 to 62 mph (100 km/h) is 12 seconds. The more upmarket version has a 45.12 kWh battery, with a CLTC range of 249 miles (401 km). The more upmarket version is powered by a 130 kW and 290 Nm electric motor, resulting in a 0 to 62 mph (100 km/h) acceleration time of 7.9 seconds.
Detailed Photos
Product Parameters
BYD-Yuan UP SPECIFICATIONS | ||
MODEL | Yuan UP 2024 70kw basic model | Yuan UP 2024 130kw basic model |
Maximum power(kW) | 70 | 177 |
Maximum torque(N-m) | - | - |
Motor(Ps) | 95 | 177 |
Length*width*height (mm) | 4310*1830*1675 | 4310*1830*1675 |
Body structure | 5-door, 5-seater SUV | 5-door, 5-seater SUV |
Maximum speed (km/h) | 150 | 160 |
Curb weight (kg) | 1520 | 1540 |
Maximum full load mass (kg) | 1895 | 1915 |
Maximum horsepower (Ps) | 188 | 188 |
Motor type | Permanent magnet/synchronous | Permanent magnet/synchronous |
Number of drive motors | single motor | single motor |
Motor layout | prefix | prefix |
Battery Type | Lithium iron phosphate battery | Lithium iron phosphate battery |
Front tire specifications | 215/60 R17 | 215/60 R17 |
Rear tire specifications | 215/60 R17 | 215/60 R17 |
FAQ
1.What's your minimum Order quantity?
1 unit.
2.What kind of payment terms can be acceptable?
We're flexible for payment terms, including T/T, L/C, D/P, O/A and of course Cash.
3.What brands do you have?
We has established long-term strategic cooperation partnership with Mercedes-Benz, BMW, GAC Toyota, FAW Volkswagen, Beijing Hyundai, BAIC Motor, GAC Trumpchi, GAC Aion, BAIC BJEV, Leapmotor, Jetta, etc. We are dealing with the most popular vehicles Made in China.
4. What kind of trade terms available from your side?
We can deal by EXW, FCA, FOB, CFR, DAP, CIF, DDP. etc.
5.How about the delivery time?
The delivery time will be various by different cars, please contact with our sales/online service for details.
6.How about your cargo ready day?
Generally, it will take 10 to 15 days after receiving your payment. The detail time depends on model & quantity of your order.
7.What's your supportive policy for distributors in overseas market?
We support in many aspects including marketing, promotion, product development/improvements, service training, advertising, etc.
8.If I have other questions, who should I ask?
You can contact us here online, our sales will respond within 10 mins.
Customer Reviews